LOADING

Type to search

GDOT: Lane closures ahead for I-75, I-285

Avondale Estates Decatur Kirkwood Metro ATL voter's guide

GDOT: Lane closures ahead for I-75, I-285

Atlanta Downtown Connector. Source: Wikimedia commons. https://commons.wikimedia.org/wiki/File:Atlanta_75.85.jpg
Share
Atlanta Downtown Connector. Source: Wikimedia commons

Atlanta Downtown Connector. Source: Wikimedia commons

The Georgia Department of Transportation plans to work on I-285 and the I-75 express lanes project this weekend, which means there will be lane closures.

Be prepared for delays.

Here’s the full project list, courtesy of GDOT:

– On I-75, two northbound lanes will close between SR 280/Delk Road and Windy Hill Road nightly from 9 p.m., Friday until 5 a.m., Monday

– On I-75, one southbound lane will close between SR 280/Delk Road and Windy Hill Road from 9 p.m., Friday until 5 a.m., Saturday

– On I-75, one northbound and two southbound lanes will close over I-285 between Windy Hill Road and Cumberland Parkway from 10 p.m., Friday until 5 a.m., Saturday

– On I-75, two northbound and two southbound lanes will close between Wade Green Road and SR 92/Alabama Road from 9 p.m., Friday until 5 a.m., Sunday

– On I-75, one lane will close on the southbound on-ramp from SR 280/Delk Road from 9:30 a.m., until 4 p.m., Saturday

– A flagging operation will take place on Bells Ferry Road under I-75 from 9:30 a.m., until 4 p.m., Saturday and Sunday

South Metro Express Lanes

– On I-75, one southbound lane and shoulder will close between the I-675 interchange and the Hudson Bridge Road continuously from 9 p.m., Friday until 7 a.m., Monday

– On I-75, one northbound and one southbound lane and shoulder will close between SR 138 and Mt. Zion Boulevard from 9 p.m., Friday until 5 a.m., Monday for the northbound lane and 7 a.m., Monday for the southbound lane

– On I-75, a traffic shift will take place on the Jodeco Road southbound off-ramp from 9 p.m., Friday until 5 a.m., Saturday

– On I-75, one southbound lane and shoulder will close between Hudson Bridge Road and Jodeco Road continuously from 7 a.m., Friday until 7 a.m., Monday.

– On I-75, one northbound lane, shoulder, and the northbound Jodeco off-ramp will close between Hudson Bridge Road and Jodeco Road daily from 7 a.m., until 5 p.m., Saturday and Sunday

– On I-75, a traffic pace will take place on the southbound lanes between the I-675 interchange to Hudson Road Bridge. The traffic pace will require motorists to drive 5 mph -10 mph to allow contractors to work across the interstate lanes. The Hudson Bridge Road on-ramp will be blocked during the traffic pace. The traffic pace will take place anytime between 7 a.m., and 7 p.m., on Saturday and Sunday

I-285

– Two westbound lanes and one eastbound lane will close between SR 260/ Glenwood Road and the I-20 interchange from 9 p.m., Friday until 5 a.m., Monday for sign structure work

I-75

– Sign structure work will require one northbound and one southbound lane closure between SR 120 Loop/North Marietta Parkway and SR 5/SR 5 SPUR/Canton Road Connector from 6 a.m., until 5 p.m., Saturday

Tags:

Decaturish needs your support!

Help us provide you with free, quality local news. Become a Decaturish.com supporter today

To chip in $3 a month, click here.

To chip in $6 a month, click here.

To chip in $60 a year, click here.
* Decaturish.com is not a 501-c-3 organization. Support of Decaturish goes toward our newsgathering efforts. Decaturish does not have a print edition.
close-link